Horizon Offshore Services | |
1300 W 19th St, P.O. Box 70263, Houston, Texas, 77270, USA | |
Contact: | ops@horizonoffshoreservices.com |
Telephone: | Reveal Telephone Number |
View All Horizon Offshore Services Listings |
The rig has been modified with an additional 4 stability columns to provide adequate deck load to operate in 500m of water depth. The rig was built in Aker Verdal Norway. This unit is currently drilling in SE Asia while she is due to complete her drilling campaign in Jan/Feb 2023 and will then require dry-dock for her 5-year survey - approx costs estimated at around US$ 5m. Expected timeframe for Dry Docking is 2 Months.
Owners will consider all serious offers.
General Description
This is Semi-Submersible, twin pontoon column stabilized offshore drilling unit with Max Water Depth of 1,640 ft and Max Drill Depth of 25,000 ft. It’s carrying capacity is 12299 t DWT.
Principal Characteristics:
Length Overall............................................108.2 m (355 ft)
Width Overall..............................................75.47 m (247.5 ft)
Keel to main Deck......................................36.58 m (120 ft)
Pontoon Length.........................................108.2 m (355 ft)
Pontoon Width...........................................10.98 m (36 ft)
Corner Columns (4)....................................7.92 m (26 ft)
Intermediate Columns (4)...........................5.79 m (19 ft)
Aux Columns (4).........................................5.2 m (17 ft)
Main Deck Length...................................... 69.80 m (230 ft)
Main Deck Breadth.....................................60.6 m (200 ft)
Gross Tonnage: 13590 t
Summer DWT: 12299 t
Draft:
Transit......................................................... 6.6 m
Operating.....................................................21.34 m
Survival........................................................16.76 m
Displacement:
Transit......................................16090 MT
Survival....................................222250 MT
Operating.................................24250 MT
Classification: ............Det Norske Veritas +1A1 Column Stabilized Unit
Accommodation: ..................135 Man in total
19 - Three Man Cabins
17 - Two Man Cabins
11 - Four Man Cabins
6 - Single Man Cabins
1 - Operators Office
1 - Recreational Room
1 - Galley/ Mess Room
1 - Hospital
Storage Capacities:
Drill Water.......................1232 m3
Portable Water..................556 m3
Fuel Oil...........................1325 m3
Liquid Mud Pits.................391 m3
Sack Storage Area...........169 m2
Bulk Storage:
Barite/ Bentonite................252 m3
Bulk Cement......................252 m3
Heave Compensation:
Hydralift Crown Mounted 600,000 lbs capacity 20 ft stroke
8 x 80K Rucker Tensioner 50 ft line travel
4 x guidelines, 2 x pod line Tensioner. 40 ft travel, 16000 lbs capacity each.
Cranes:
1 x Aker/ Nyland Electrohydraulic with 120 ft boom
Capacity:
- Main Block............40 MT (static)
- Whip Line..............15 MT (static)
1 x Liebherr MT1900 75D Diesel hydraulic with 136 ft boom
Capacity:
- Main Block................60 MT (static)
- Whip Line..................15 MT (static)
Power Supply:
4 x Bergen Diesel KVGB 12 (2200 BHP)
4 x WAB 1240 D8 (2150 KVA)
Mooring System:
4 x Norwinch Oilrig 2A 2 76
7 x HY 17 Stevpris MK 5 Anchor
1 x Vhyrof Steveshark MK 5 Anchor
8 Anchor Chains 3” ORQ, approx 4260 ft each
Chain chaser fitted
Drilling Equipment
Derrick:
Height...................198 ft
Base.....................40 x 40
Load Capacity......100000 0 l bs
Travelling Block - Maritime Hydraulics 590 MT ; 7 x 60” Sheaves
Top Drive - Maritime Hydraulics DDM 650HY ; 3 speeds
Hookload Capacity (lbs)...............1,000,000
Rotary Table - Continental Emsco 49½” driven with GE752 Motor, 2 Speed
Drawworks - Continental Emsco C 3 Type II Electric, driven by 3 x 1000 HP GE752 Motor.
Mud Pumps - 3 x Continental Emsco 1500FB, 1600 HP
Diverter - Regan KFDS Diverter with 12” ; Flow lines
BOP Stack - 15,000 WP BOP Stack
18 ¾” Annular BOP - T 3 Energy
Services - 3 x Pipe Ram Cameron & 1 x Blind Shear Ram Cameron
Vessel name: | Upon request |
Condition: | In good maintenance condition. Working Hot Rig. |
Vessel type: | Semi-Submersible Offshore Drilling Rig |
Designer: | Aker ASA |
Builder: | Aker Verdal, Norway |
Model: | H-3 |
Fit Out: | Yes. In Class |
Constructed: | 1977 |
Refitted: | 2021 |
Registry: | Port of Monrovia |
Class Society: | DNV-GL |
Class Notation: | +1A1 Column Stabilized Unit |
Berths: | 135 |
Fuel type: | Diesel |
Drive type: | Other |
Cruising Speed: | 5 Knots |
Maximum Speed: | 6 Knots |
Length over all: | 108.2m |
Beam: | 75.47m |
Maximum draft: | 6.6m |
Hull type: | Displacement |
Hull colour: | Red x 3 codded |
Displacement: | 16090 metric tons |
Fuel capacity: | 1325 Cubic Metres |
Water capacity: | 556 Cubic Metres |
135 Man Accommodation
19 - Three Man Cabins
17 - Two Man Cabins
11 - Four Man Cabins
6 - Single Man Cabins
1 - Operators Office
1 - Recreational Room
1 - Galley/ Mess Room
1 - Hospital
In good order. The rig was built in Aker Verdal, Norway.
Drilling Equipment:
Drawworks Type:................Continental Emsco C3 Type II
Drawworks HP....................3,000
Mud Pumps Type...............Continental Emsco FB-1600 Triplex
Top Drive............................Aker Maritime Hydraulics DDM-650
Hookload Capacity (lbs).....1,000,000
All NAV & COMM's equipment/ systems are in good order.
P o w e r S u p p l y:
4 x Bergen Diesel KVGB 12 (2200 BHP)
4 x WAB 1240 D8 (2150 KVA)
Well maintained & upgraded.
In good operational order and well-maintained further drilling campaigns.
Neat, good quality and well maintained.
All FFE/ LSA in good order. SOLAS vessel.
The unit requires dry-dock for her 5-year survey.
Charter Information: | Upon Request. |
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A Buyer should instruct his agents, or his surveyors, to verify such details as per Buyer desires (project plans/scopes of work) are validated.
This vessel is offered subject to availability, price change, or withdrawal without notice.
Note: Indicated location is approximate general area only.